Cost guide
Electrical Panel Upgrade for an EV Charger
If your home does not have enough available electrical capacity, a panel upgrade can add $1,800 to $4,500 or more before the charger is installed.
Why It Matters
A Level 2 charger often needs a dedicated high-load circuit. Older 100A panels may need load management or a full service upgrade.
Cost Range
| Load management | $450 - $1,200 |
|---|---|
| Panel upgrade | $1,800 - $4,500 |
| Service upgrade | $3,000 - $7,500+ |
Lead Quality
These projects are valuable for electricians because the homeowner needs diagnostic work, permits, and a higher-ticket electrical scope.